A Day in the Life of a Civil Engineer – Day 50

Day 50

Geneva Photos

Today was Wednesday so we had our engineering division staff meeting. Like our last staff meeting, it seemed there was quite a bit to discuss. Everyone shared the status of their projects and other tasks they have been working on. We have been on schedule with everything except for a few projects that have been delayed because agreements have not yet been reached with some property owners.

One of our projects that consists of adding a third deck to our existing commuter parking garage has been delayed because the RTA has been reviewing it for about 3 months now. We haven't heard anything, nor do we know why it is taking so long. Metra already performed their review, and we received their comments within a few weeks. So now we cannot start building before winter and will have to wait to bid it out. This means construction won't begin until next Spring. I guess that's $3.5 million dollars worth of work that is on the shelf instead of creating jobs and stimulating our economy! (Our garage is shown in the back and to the right in this photo.)

Failed storm sewer pipe

We took a field visit to a job site where our water department has been working on a "sinkhole." Usually these holes show up in pavement or yards because of some failure in the sewer system. In this case, it appears the concrete storm sewer pipe had settled allowing a pipe joint to open up on the bottom. So when water flowed through, sand from the area around the pipe would be lost. Our crew dug up the area, sealed the joint,and backfilled the hole. I wish I had taken a photo, but had not brought my camera.

Racoons don't fit in sewers!

IMG_4908

We've already had problems with racoons in one sewer in town where two had become wedged and died. We finally discovered them when we received reports of the pipe not flowing properly. Well, today our water foreman was on scene with the crew to rescue a racoon who had wedged himself between the openings of an inlet curb frame. He managed to pull out the racoon, but the animal, being scared, tried to run right back in and wedged himself even worse. So the foreman tried again to pull him out by his tail. The crew videotaped it  - I wish I could have gotten a copy to show here! The second time he pulled him out, he pulled him far enough back so when he released him the racooon ran off under the truck. Wow! Not sure I would have tried to pull a racoon out of a sewer! (The photo, by Andrew Ratto, is not of the racoon we rescued, but illustrates that racoons love to hang out in sewers!)

Development Issues

I am still messing around with that review of a development where we discovered the water main had to be lowered. Today I had to send out an email asking for the engineer to document the changes he will be making. Later in the day, staff had some email discussions about other concept developments in the community so I participated in those.

Performance review and Goals and Objectives

Today, I also had my mid-year performance review. And I still need to hold the reviews for the rest of my staff. I also revised my goals and objectives 2nd quarter report and resubmitted it because the city administrator asked for all of us to submit them in a standard format.

Share

A Day in the Life of a Civil Engineer – Day 48

Day 48

Although we did not have today off, many others in the community did including the schools. So I think quite a few people at work took the day off so it seemed a little more quiet than normal at work. I started out going through emails and preparing for several meetings I had scheduled throughout the day. 

Staff Development Meeting

This was our regular day for our staff development meeting. We discussed several issues that had gone through planning commission and city council such as a special use granted for our proposed parking lot and a change in our sign ordinance. We also discussed a few of the developments that had been submitted and talked about their status. A couple of our planners had attended a planning conference held here in the suburbs so they shared some of the information they learned at the sessions they attended.

GIS Team Meeting

Unfortunately I left the meeting early because we had a GIS team meeting scheduled. Only about half of our team could make the meeting, but we had a good discussion and shared many of the things we are working on in GIS. We also shared with everyone our problem last week with the password changing and disruption of the web application. We also talked about the address assignment document I had set up. I need to add a few things to it, then I am going to send it to the building department for their comments because they are the ones who will initiate the assignment. Some of the features we talked about were our building layer, our critical facility layer, and our fire hydrant layer.

Development Site Meeting – Precon

Water Distribution

The last meeting I had was with the contractor and engineer for a development that is close to being approved for construction – we expect to issue the letter this week. Fortunately another engineer from the office went with me because he caught something none of us had seen during the design and review of the plans. They are lowering the parkway significantly for the proposed driveway which I had not realized during the review. The reason this is important is our water main crosses the drive, and if they lower the parkway four feet, our water main will no longer have the five feet or more of cover we require due to frost. So they will have to lower our 12 inch water main for a distance of about 100 to 200 feet. At least it was caught now instead of after the contractor started working. And I guess that's why it's so important to have a meeting prior to construction.

City Council Meeting

Finally, tonight I attended the city council meeting because we were asking them to consider awarding our culvert lining project to the successful bidder. Most of the time this type of action would be fairly routine, but I wasn't sure this would be the case tonight because we had a bidder who had not submitted a complete bid, and his price had been lower than all the other bidders. Our attorney had advised us that the bid was not "good" so the next bidder ended up having the lowest, responsive bid. We did inform the company with the incomplete bid, but instead of accepting our decision, he wrote a letter to the mayor and council asking that they waive the requirement and award him the bid. Fortunately we have a great council that understands the process and implications of ignoring laws and requirements. So there wasn't even discussion on the matter – they went ahead and awarded as we had advised.

Share

A Day in the Life of a Civil Engineer – Day 46

Day 46

Development Review

On a 1 to 10 scale of busy, I'd say today was about an 8. Most of my time seemed to be spent handling issues related to one of the developments I have been reviewing. This particular one has been a challenge because the design has changed throughout the review process. And all of us have worked hard to accommodate these changes without holding up the review. I've had my final approval letter ready since last week, but hadn't been able to send it because I kept hearing the plans were yet to be changed. Finally I was told there would be no more changes so I sent it off. But now, they are going to change the plans. So later this week, we will get the revisions and work on getting a review completed as fast as possible so a new final approval letter can be sent.

The whole thing reminded me of a discussion that took place in the Civil Engineering Central Group on LinkedIn where someone had asked: What is your most frustrating story about a government permitting process?  I imagine the person asking had probably only thought frustration would be on the applicant side. But of course, the reviewers end up just as frustrated sometimes as the applicant. In the end, there were 16 comments representing a good range of viewpoints from both sides. Because the group is closed, I can't really share much more than that. But if you are on LinkedIn, you can join the group and participate in discussions like this. It's helpful to talk about common challenges and read comments from people who have different experiences and beliefs.

Alley Project

Manchester Alley in Geneva IL

As I mentioned yesterday, the contractor placed about half of the concrete alley on our project. So today the project engineer and I visited the site to check it out.. The contractor was working today forming up the pavement for the last half of the alley. (The photo to the right shows the same contractor placing concrete on the east half of the alley last year.)

Sidewalk Project at City Building

A couple of us also met with other city staff about improving an entrance to one of our city buildings. There is a slight threshold at the door we were trying to eliminate. Although the work seems simple enough to do – remove and replace sidewalk – when you factor in all the restrictions and regulations, it becomes quite a complicated project. We needed to ensure we were meeting ADA and also make sure we didn't create any hazards with the new design. After talking about several solutions, it was decided that we would go back and draw up what we talked about so we can share this information with our supervisors. Then they can decide which alternative to implement.

Address Assignment

One of the issues that has come up at our GIS meetings is that we need to improve the manner in which we communicate address assignments. I have been trying to find sample forms used for this process from other agencies, but so far no luck. So today I started working on a draft form. I want to get something to pass out at our next GIS meeting so everyone can review it and offer comments.

Miscellaneous

I also took care of a few other minor tasks including helping someone determine the size and location of their water line. And I wanted to mention I will be taking off tomorrow to attend a parent-student day at the middle school. Which might make for another whole blog post!

Share

A Day in the Life of a Civil Engineer – Day 44 and 45

Day 44

Hopefully today will be the last day I have to combine more than one day in a post – finally getting somewhat caught up. Today, I went through more emails. And I finished up the final approval letter for that development I worked on last Friday – it is for an industry in the city that is expanding. We had several meetings then throughout the day:

South Street Bike Trail

The county has been planning on building a bike trail underpass at one of the busiest roads we have in the city. Right now it is a four-land road with a 45 mph speed limit with plans to someday expand it to six lane. The number of cars is probably around almost 30,000 a day. So crossing it can be a challenge on a bike or as a pedestrian. In order to help get people across, the county is proposing this underpass. They have received funding for a portion of it from the state. So now, they are ready to move forward and finalize the design then go to construction. They told us today they are looking at building it in fiscal year 2013. We discussed some of the coordination needed between the city and the county to get the project done. They will be acquiring an easement from us, and we will be entering into an agreement. But the terms of all that still need to be worked out.

Utility Proposal

A utility has proposed an installation in our community that is unlike any other submittal we have yet received. So we met today to discuss the information. From my perspective, I had received an application for a right of way permit, but upon reviewing the plans I realized the proposed location is not within the right of way. So the application is not valid for this case.

Campbell Street Parking Lot

We also met to continue discussions about our plans to build a parking lot in our downtown area. We were mainly updating other staff members of the status. The city is still working out the easements with the adjoining owners that will be necessary to  finalize the design.

Concrete Construction

A couple of us also had to inspect a few areas throughout the city that are targeted for improvements. We are in the process of obtaining bids for a small amount of concrete repairs we want to finish up this Fall.

 

Day 45

Finally today! This morning I worked on a multitude of issues. I completed our mid-year goals and strategies report and sent it off to my supervisor. Then I made sure my forms were ready to conduct performance evaluations later this month. All of us also worked on writing up our monthly reports for all our projects.

We had a bid opening today for our culvert project. There were a few bidders and the project seemed to come in near the engineer's estimate so we will now prepare the information to take it to the council for approval. Before I mention anything else about this publicly, I am waiting for an official determination of the successful bidder.

And our contractor for our alley project finally was able to place half of the concrete pavement. After last week's rain, we have had to wait a few days for the base to dry out. But today, it was finally ready for the pour.

In the afternoon, we had a staff development review meeting to go over a small proposed development in the city. It's so helpful to have all of us get together at once and just discuss the project after we've had some time to look it over. Many people brought up good discussion points. So now the review engineer will incorporate the comments into his response and send it out later this month.

 

Share

A Day in the Life of a Civil Engineer – Days 39 to 43

Day 39 through 43

Day 39—Monday, Sept. 26

On Monday I attended our staff development meeting. We discussed several of the projects that are either under review or construction. We also talked about the challenge of helping people understand and follow through our development process which is as follows: during the concept stage, our staff meets with the applicant and discusses the project and explains the steps necessary to move through the process. Then once we receive a submittal, all departments prepare a review and our development department sends out a comprehensive review letter. This submittal-review process then repeats until the plans have been approved. Then permits can be issued and construction can begin. If a special use or zoning change is required, then there is a planning commission meeting, recommendation, and subsequent council consideration prior to permits being issued and final approval of the plans.

So we are trying to come up with a solution that will readily convey the process and provide guidance throughout. We have a few ideas, but will continue the discussion over more meetings.

ARRA Project Close-out

I’ve been working on closing out last year’s federal ARRA project for some time now. It is always amazing to me that design can take a couple months, construction can be completed in a month or two, but finalizing the close-out documents can take a year or more. This can happen for many reasons, but in this case, it’s been because I’ve been waiting for certifications for materials used on the job. And I need this information because I cannot determine the final quantities used on the job or send in pay requests for items unless the contractor provides proof that the material meets the specification. Finally for one of our items, we had to just delete it because the subcontractor simply would not provide the documentation. The general contractor and I even tried to get it from the supplier of the material, but they also would not provide the information.

So today I went through all my material documentation and made sure it met the requirements and that I had all the forms filled out correctly and signed. I also checked all the quantities and created what is known as a balancing authorization. This is necessary to prepare and submit for approval at the end of the job because we can only pay for the actual amount of an item that has been approved. For example, if the project was bid out at 700 tons of asphalt, but we actually used 750 tons, I would need to first send in an authorization asking to add 50 tons of asphalt to the project before I could pay the contractor the full 750 tons. Until I received approval for that extra 50 tons, I could only submit a pay request for 700 tons. And in reverse, if we only used 650 tons, I could pay for the whole amount, but at the end of the job, I would need to deduct 50 tons from the project so the final amounts equaled exactly what was actually used.

 

Day 40—Tuesday, Sept. 27

On Tuesday, we had a meeting about a few developments that still have outstanding letters of credit. The reason we are looking into the status of these projects is because they’ve been out there for some time, and there are still some public improvements that need to be made. It seems like many cities are dealing with this because of the economy and housing crisis. People stopped building in subdivisions that were not yet completed and the developer never finished the improvements. But the people who did build don’t want to wait for the economy to turn around to get the road finished, the trees planted, and their sidewalks placed. So cities are moving forward to complete those improvements, particularly in cases where a letter of credit was filed that can help pay for them.

After lunch, our intern and I drove up to IDOT to drop off the documents I had prepared yesterday. We like to do this because some paperwork is too important to just put in the mail. It was nice because I was able to meet some of the people I have been working with only over the phone, and our intern was able to see the process and meet some of the people we work with.

 

Day 41—Wednesday, Sept. 28

This morning we had our bi-weekly staff meeting. Everyone shared the status of their projects as usual. We have one culvert lining project out to bid and have already started getting ready for next year’s road project. Then during the lunch hour, the group of us who were traveling to Prairie State left to drive down south. This trip took up the remainder of our day.

 

Day 42—Thursday, Sept. 29

Prairie State

Prairie State Power Plant

On Thursday, we toured the Prairie State Power Plant and Lively Grove Mine. Our city is one of eight partners making up the ownership of this facility. So our staff regularly attends meetings, and a group of staff and elected officials take an annual trip to see the progress of construction of the plant. This was my first year to go on the annual trip, and it was particularly interesting because the plant is nearly complete. The first coal was fired last week in the first unit, and the operators expect to feed into the grid for the first time next week. There is another unit that is currently under construction and has a completion date of mid 2012.

Our day started with a quick update on the facility. Then several of us were taken down into the mine in groups of six. This was the first time I had ever been in a coal mine. The Lively Grove Mine is about 250 to 275 feet deep with tunnels laid out in a grid pattern and measuring 18 feet wide by about 7 feet tall. I wish I could have taken pictures to share with everyone the experience, but they were strict about no photography allowed. Before we could go in the mine, we were outfitted with safety equipment and taught how to use an oxygen container in case something happened while we were down there. I even wore a hard hat with a little miner light on it.

We drove down into the mine in a small open metal vehicle down a steep slope. Once at the bottom we followed a main corridor excavated out of the coal and now lined with lime dust. Eventually we stopped and got out to walk. Our guide took us to where a machine was cutting out the coal and conveying it to a vehicle. This vehicle when full would then take the load of coal, up to 10 tons, to the main conveyor and discharge it onto the belt. Then it would return to be loaded again.

We also watched a crew installing the metal mesh and supports for the roof of the tunnel. They showed us the metal rods and “glue sticks” they would push up into the roof to create a header. Then a wire mesh would be anchored over these. While the ceiling of the tunnel seemed to be made of rock, the floor appeared to be clay covered in lime and coal dust.

One of the interesting things I eventually figured out was to look at something, I would need to turn my head directly towards it. This was because the only light came from the lights on our hats. And I noticed when you talked to someone, you had to make sure you were not focusing the light on their face.

I also couldn’t help thinking while down there about my ancestors, many of whom worked in coal mines in Kentucky and in England. The safety precautions now are so much more intense than they were back then. We had ventilation, gas detection, oxygen, lights, power, wireless GPS, and many more features they did not have in the early 1900s.

After the mine tour, we were taken through the actual plant. Here power is generated from turbines turned by steam. The steam is created by burning the coal taken from the mine. They told us this is the largest coal-fired power plant that has been built in the U.S. in the last 30 years. It had to be built to meet strict air quality regulations—$1 billion was spent just on the air quality treatment and components.

The plant also uses 25 million gallons of treated water a day for their operation. They have an onsite pond and treatment facility to produce high quality water. When finished the power plant will produce 1600 MW of power for the grid and 150 MW for its own operation.

 

Day 43—Friday, Sept. 30, 2011

On Friday, I worked to catch up on emails and other issues that had come up while I was gone. Most of my day was spent working with other staff to resolve the review of a development. They owners of this project had considered changing the design of some of the infrastructure, but since they already had their plans approved, they decided not to go ahead with the change. It would have required them to re-submit and wait for another review. We also had a conference call with the owner/developer and explained they could not begin construction on any work requiring an IEPA permit until it was approved and a copy sent to us.

Smith and Richardson Tour

A few of us also were fortunate to be able to tour another manufacturing business in our city—Smith and Richardson. This company has been in Geneva for many years and moved to their current location in the 1940s. They make all different kinds of parts for many different industries. An interesting issue brought up during our tour is that our country does not seem to be training people to work in these types of industries. This company has job openings for skilled labor, but they have difficulty finding people who can work that type of job. This is something we have been hearing at several of our tours. Because U.S. schools are so focused on pushing kids to go to college, few end up pursuing careers in manufacturing or other trades. So these industries have job openings, but there is no one to fill the jobs.

Retirement Lunch

Today was also the last day for one of our co-workers who worked at the wastewater plant. So during lunch the people at the plant arranged to cook food, and we were all invited to eat down at the plant. Only a bunch of public works people would gladly show up to eat lunch on the lawn of a wastewater plant next to the clarifiers and think nothing of it.

Share

A Day in the Life of a Civil Engineer – Days 34 through 38

In an effort to catch up on my postings due to attending the APWA conference, I'm combining all last week into one post then following up tomorrow with the first two days of this week. 

Days 34 through 36

Day 34 was spent attending the APWA conference in Denver. You can read a short summary of my day on the post before this one: 2011 APWA  Conference – Day 2. There are a couple extra items I probably should have added to this post, but they really deserve a post by themselves so will write something up later this week.

Day 35 was also spent at the APWA conference – I also need to summarize this day on a separate blog post. 

Day 36 was spent traveling back from Denver. Before leaving, I tried to take a lot of photos around the Capitol building. You can look through my photostream on Flickr here: Denver Colorado Photostream. There are quite a few photos illustrating streetscape elements, construction, and other design elements.

Day 37

Of course, my first day back at work after the conference was spent mostly catching up. I went though emails and met with my staff to discuss the status of certain projects. I also worked on preparing a status update for an STP project we have scheduled for FY2013.

Day 38

Chicago 2011 Sept (101)

Finally on Friday, another engineer and I attended a "lunch and learn" about natural area management. It was presented by Karen Kase who works for Hampton, Lenzini, and Renwick. I've mentioned her before on this blog – Karen is part of a team at HLR managed by Erica Spolar that focuses on design and management of natural areas including wetlands, stormwater basins, etc. The information they shared with the group is important because our area has constructed these natural areas everywhere, but it appears that when they were put in, a management plan was not always created. So many of us are now working to address this component. And until now, there was little formal guidance on how to handle this aspect of these natural areas. 

Our office also had scheduled the carpets to be cleaned over the weekend so all of us had to clear out our offices. You don't realize how much stuff you have on the floor until you have to move it. Today I told another co-worker, I was starting to think maybe they did this to encourage us to minimize what we put on the floors!